Phan Lam 2 solar power plant was built in Doc Da village, Phan Lam commune, Bac Binh district, Binh Thuan province, Vietnam. The factory was put into commercial operation on December 17, 2020.

58.88 ha

Land area

40.95 MW

Total capacity

83.066 million kWh

Average annual production

The history and development

The Phan Lam 2 solar power plant was built with the goal of adding clean energy to the national power system and adapting the electricity supply needs of the power system in general and Binh Thuan province in particular.

Phan Lam was built with a capacity of 49 MWp and connected to the national power system at a voltage of 110 kV.

The plant also has a big goal as one of the first solar power projects in Vietnam, contributing to creating the premise and basis for the development of clean solar energy. In line with the electricity development orientation of the government, the Ministry of Industry and Trade and the Vietnam Electricity Group.